Full MEP consultancy duties for a new purpose-built 78-bed care home (use Class C2) for Lovett Care, let under a Design and Build form of contract, with an energy strategy aligned to BREEAM Excellent In-Use.
A new purpose-built 78-bed care home for use Class C2 at King’s Hill, developed by Lovett Care.
Rubix MEP have been appointed for full MEP consultancy duties, with the project being let under a Design and Build form of contract.
Our duties run from the energy strategy and overheating assessment through performance specification, post-contract design reviews and clerk of works inspections, to commissioning witnessing and project close-out including Practical Completion reporting.
Energy Strategy aligned with the client’s aspirations, including BREEAM Excellent In-Use, and Dynamic Thermal Assessment for compliance with AD Part O (Overheating) of the Building Regulations.
Infrastructure design including redundant supplies, diversions and new connections, plus the MEP Performance Specification and Design Strategies.
Post-contract detailed design reviews, clerk of works duties including evaluation support and inspection and reporting of MEP installations, commissioning support and witnessing, and Practical Completion reporting.
Later living, care or retirement community. Start the conversation.