Retail & Hospitality · Cat B fit-outc. £2.0mSpace Group

Shepperton Studios

MEP design and Category B fit-out for the food and beverage spaces at Shepperton Studios: a coffee shop, catering kitchens, restaurant and servery spaces across three buildings, delivered as part of the wider £500m studio expansion.

Space Group
Client
c. £2.0m
Construction value
3
Buildings · F&B fit-out
RIBA 4
Detailed MEP design
BIM Level 2
Clash-free Revit model

The project

The project is part of the wider £500m expansion that will make Shepperton Studios the second largest film and TV studio in the world.

It includes the design and Category B fit-out for the food and beverage spaces, providing a coffee shop, catering kitchens, restaurant and servery spaces across three buildings.

Rubix MEP were appointed to deliver the MEP design in support of the catering and interior design, with detailed coordination in BIM against the Category A design and installation undertaken by others.

Shepperton Studios: external view of the studio buildingsShepperton Studios: fitted-out food and beverage interior
“This project was a highly prestigious scheme, with detailed coordination required using BIM. Rubix were excellent and are now our ‘go-to’ MEP designers.”
Chris Lee, Space Group

What we delivered

RIBA Stage 4 MEP design

Detailed design including HVAC systems, natural gas, small power and data, LV distribution and lighting / emergency lighting.

Category A coordination

Full coordination of MEP services with the Category A design and installation undertaken by others.

BIM Level 2 delivery

Production of the MEP Revit model complete with BIM Level 2 output and a clash-free model, plus technical support for the site installation team.

Appointment highlights RIBA Stage 4HVAC & natural gasLV & lighting designCat A coordinationClash-free Revit modelSite installation support

Let's talk about your project

Studios, media or commercial fit-out. Start the conversation.